With the New Millennium, the materials used in the production of bodyparts have changed, going from metals to plastics.
FREECARS, too, introduced into its production many components in mixed plastics, by adopting advanced production processes and ensuring the complete equivalence of products with the original.According different material,we have different professional produce machine.
SMC ( Sheet Moulding Compound) – UP GF 30
ABS (Acrylonitrile-Butadiene-Styrene)
PC (Polycarbonate)
PA (Polyamide – Nylon)
PMMA (Polymetyl Methacrylate)
PP (Polypropylene)
PU (Polyurethane)
POM (Polyoxymethylene)
UP (Unsaturated polyester- SMC)
PVC (Polyvinyl Chloride)
ASA (Acrylonitrile-Styrene-Acrylate Terpolymer), *
PBT (Polybutylene Terephthalate).
Metal (Steel, Aluminium……)
Automobile Rearview Mirror Production
1.Raw material preparation
Prepare raw materials: plastic pellets for housing, glass blank for mirror, metal brackets, adhesive and sealing rubber.
2.Injection molding of mirror housing
Inject molten plastic into mould, cool and demould to form the rearview mirror shell, then trim burrs.
3.Mirror glass processing
Cut glass to required size, grind edges, clean the surface, then coat reflective layer on glass back.
4.Coating & surface treatment
Spray paint on plastic housing for color and anti-corrosion treatment.
5.Component assembly
Install reflective glass, adjusting motor, bracket and wire harness into the housing, use adhesive to fix parts.
6.Performance testing
Carry out tests for reflection effect, angle adjustment, vibration resistance and waterproof property.
7.Cleaning & packaging
Clean finished products, paste protective film, then pack for delivery.

Automotive Lighting Production
1.Raw material preparation
Prepare PC plastic pellets for lens, ABS plastic for lamp housing, aluminum for reflectors, LED chips, PCB boards and sealants.
2.Injection molding
Melt plastics and inject into precision molds. Cool and demould to get lamp housing and lens, then trim burrs.
3.Reflector metallization
Vacuum aluminum plating on the reflector surface to form a high-reflection layer.
4.Component pre-assembly
Mount LED chips, PCB, wiring harness and reflector modules into the lamp housing.
5.Sealing assembly
Combine lens and housing by gluing or hot plate welding to form an airtight lamp cavity.
6.Performance & reliability testing
Carry out light distribution test, power-on aging test, waterproof, dustproof and vibration tests.
7.Cleaning and packaging
Clean qualified headlights, attach protective films and pack for delivery.

SMC Exterior Parts Production
1.SMC material preparation
Cut SMC sheet (glass fiber reinforced thermoset resin) into required blanks and peel off carrier films.
2.Mold preparation
Clean the metal mold and apply release agent, then preheat the mold.
3.Compression molding
Place SMC blanks into the heated mold. Close the press and apply heat & pressure. The material flows and cures to form the part.
4.Demolding & trimming
Open the mold, eject the cured part. Cut off flash and excess edges.
5.Surface treatment & painting
Sand and clean the surface, then spray primer and topcoat to get Class A finish.
6.Inspection and packaging
Check dimension, appearance and defects. Pack qualified truck exterior parts.

Plastic Exterior Parts Production
1.Raw material preparation
Dry plastic pellets and add color masterbatch as required.
2.Mold setup
Install and preheat the injection mold on the machine.
3.Injection molding
Melt plastics, inject the melt into the closed mold cavity, cool and solidify.
4.Demoulding & trimming
Eject the part, remove sprues, runners and burrs.
5.Surface treatment (optional)
Sand, spray paint or apply texture for appearance.
6.Inspection
Check dimensions, appearance and defects.
7.Packing
Pack qualified truck plastic parts for delivery.

Sheet Metal Exterior Parts Production
1.Raw material preparation
Prepare steel/aluminum sheets and cut them into blanks.
2.Stamping
Use stamping dies to form the blank into required shape.
3.Trimming & piercing
Cut excess edges and punch mounting holes.
4.Flanging & reshaping
Bend edges and calibrate part geometry.
5.Surface treatment
Clean, degrease and apply electrophoretic coating.
6.Painting
Spray primer, topcoat for corrosion resistance and appearance.
7.Inspection & packaging
Check dimension and surface quality, then pack finished parts.

Radiator & Intercooler Production
1.Raw material preparation
Prepare aluminum foils, tubes, headers and side plates.
2.Fin & tube fabrication
Form cooling fins and cut aluminum tubes to length.
3.Core assembly
Stack tubes, fins and baffles to build the heat exchanger core.
4.Brazing
Put the core into furnace for vacuum brazing to join all components.
5.Tank assembly
Mount plastic or aluminum tanks onto the core and seal joints.
6.Leakage & performance test
Conduct air tightness test and heat exchange performance inspection.
7.Cleaning and packaging
Clean qualified products and pack for shipment.
